Central Italy earthquake - Road rehabilitation projects (RNDT Dataset) - Version 2.0

The road network affected by the earthquake is particularly extensive and damaged in a significant and widespread manner. To ensure greater effectiveness in the restoration of the road network, in agreement with the Civil Protection Department, the Implementing Body decided to proceed both with the reconnaissance and identification of the interventions and with the development of a "Program for the restoration of roads affected by the earthquake" , according to a succession of incremental operational excerpts. In defining the extension of the sections, reference was obviously made to the value of the road network in terms of mobility. Following the definitive approval of the first and second section of the program (March 20 and April 19, 2017), the Implementing Body was able to start the planning of the interventions following the order of priority established in agreement with the local authorities. The first calls for tenders for the works were published in May 2017. All the tenders for the assignment of the restoration will be awarded with an accelerated procedure, always guaranteeing transparency, free access and competition. In agreement with the Administrations and managing bodies, the interventions to be carried out have been aggregated into projects to give greater efficiency to the supply chain processes in carrying out the works. The aggregation followed two general criteria:1) by type of intervention, in relation to the specific skills and professionalism necessary for the planning and construction (defense works on slopes, structures, road body, etc.);2) by road itinerary, in relation the need to closely coordinate the works on a single road, also for construction site and operation.

Data en bronnen

Extra Informatie

Veld Waarde
Laatst gewijzigd april 27, 2023, 08:47 (UTC)
Gecreëerd april 27, 2023, 08:47 (UTC)
GUID PCM:TERAG2016_5:20170922:154500
access_constraints ["https://creativecommons.org/licenses/by/4.0/"]
bbox-east-long 13.885194
bbox-north-lat 43.401636
bbox-south-lat 42.393326
bbox-west-long 12.394444
contact-email viabilita.sisma@stradeanas.it
coupled-resource []
dataset-reference-date [{"type": "publication", "value": "2017-08-21"}, {"type": "revision", "value": "2018-05-03"}]
frequency-of-update notPlanned
harvest_object_id 98b31e5c-70cd-403d-86a3-7db910931e1b
harvest_source_id 5045f9a0-4055-43f6-b140-9cd49466666b
harvest_source_title GeoDatiGovIt RNDT
licence []
lineage The projects are not born as a territorial entity in itself. For their georeferencing we started from the location of the interventions that make up each project. The projects attributable to interventions arranged along a road section were interpreted as "linear" and the road graph affected by the same interventions was georeferenced. In general, projects that include at least 3/5 interventions have been considered "linear". In other cases the projects have been georeferenced with the points of the interventions that compose them become punctual or multipoint. Subsequently, for each geometric entity (lines, points, multipoint) a buffer of 100m was generated for the symbolic representation of the progress on the map.
metadata-date 2017-09-22
metadata-language ita
progress
resource-type dataset
responsible-party [{"name": "Actuator for the restoration of traffic in the territories affected by the 2016 seismic events at ANAS S.p.A.", "roles": ["pointOfContact"]}]
spatial {"type": "Polygon", "coordinates": [[[12.394444, 42.393326], [13.885194, 42.393326], [13.885194, 43.401636], [12.394444, 43.401636], [12.394444, 42.393326]]]}
spatial-data-service-type
spatial-reference-system
spatial_harvester true
temporal-extent-begin 2016-08-24
temporal-extent-end 2017-08-04