-
Duration of flooding on and along the road after a shower of 70 mm in 1 hour
Duration of flooding on and along the road after a shower of 70 mm in 1 hour -
Weigh bottlenecks in heat
Weigh bottlenecks in heat -
New business parks allowed (Environmental Vision 2016-2020)
This file contains areas where new business parks are permitted as laid down in the Environmental Vision for the Province of Groningen 2016-2020. -
Existing provincial roads (Environmental Vision 2016-2020)
This file contains existing provincial roads as established in the Environmental Vision for the Province of Groningen 2016-2020. We are the manager of the provincial road... -
Reserved route rail connection (Environmental Ordinance 2016)
This file contains reserved routes of railway lines as established in the Environmental Ordinance Province of Groningen 2016. -
Vulnerability of VRI control box after 35 and 70 mm shower in 1 hour
Vulnerability of VRI control box after 35 and 70 mm shower in 1 hour -
Maximum water depth on and along the road after a shower of 35mm in 1 hour
Maximum water depth on and along the road after a shower of 35mm in 1 hour -
Land subsidence provincial roads - bridges
Land subsidence provincial roads - bridges -
Vulnerability bridges to heat
Vulnerability bridges to heat -
Bottlenecks for bicycle paths in the heat
Bottlenecks for bicycle paths in the heat -
Reserved rail connection route (Environmental Vision 2016-2020)
This file contains reserved routes of railway lines as laid down in the Environmental Vision for the Province of Groningen 2016-2020. The reserved route between Roodeschool and... -
Duration of flooding on and along the road after a shower of 35 mm in 1 hour
Duration of flooding on and along the road after a shower of 35 mm in 1 hour -
Reserved route road connection (Environmental Ordinance 2016)
This file contains reserved routes of provincial roads as established in the Environmental Ordinance Province of Groningen 2016. We have included the routes for new road... -
Accessibility of roads during flooding
Accessibility of roads during flooding -
Passability of cycle paths after a shower of 70 mm in 1 hour
Passability of cycle paths after a shower of 70 mm in 1 hour -
Passability of roads after a 70 mm shower in 1 hour
Passability of roads after a 70 mm shower in 1 hour -
Maximum water depth on and along the road after a shower of 70 mm in 1 hour
Maximum water depth on and along the road after a shower of 70 mm in 1 hour -
Weighing vulnerability to heat
Weighing vulnerability to heat -
Vulnerability OVL control box after 35 and 70 mm shower in 1 hour
Vulnerability OVL control box after 35 and 70 mm shower in 1 hour -
Reserved road connection route (Environmental Vision 2016-2020)
This file contains reserved routes of provincial roads as laid down in the Environmental Vision for the Province of Groningen 2016-2020. We have included the routes for the new...