-
Duration of flooding on and along the road after a shower of 70 mm in 1 hour
Duration of flooding on and along the road after a shower of 70 mm in 1 hour -
Weigh bottlenecks in heat
Weigh bottlenecks in heat -
Klinkerweg
road in the outlying area paved with vowels, a type of brick that does not absorb water, so it is suitable for foundations, paving, etc. -
Substations express tram Utrecht - Nieuwegein/IJsselstein (SUNIJ)
Tram system in the municipality of Utrecht and Nieuwegein and IJsselstein. The express tram was built in the 1980s to provide access to the growth centers / dormitory towns. -
Vulnerability of VRI control box after 35 and 70 mm shower in 1 hour
Vulnerability of VRI control box after 35 and 70 mm shower in 1 hour -
Structural vision RO, Economic axes - Vision map
These are economic axes as included in the Vision Map of the RO Structural Vision. -
Maximum water depth on and along the road after a shower of 35mm in 1 hour
Maximum water depth on and along the road after a shower of 35mm in 1 hour -
Land subsidence provincial roads - bridges
Land subsidence provincial roads - bridges -
Regional tram stops Utrecht CS - Utrecht Science Park (Uithoflijn)
Tram stops along the Uithoflijn -
Vulnerability bridges to heat
Vulnerability bridges to heat -
Infrastructure (lines) - Structural Map Structural vision RO (incl. parts D a...
These are the infrastructure lines as included in the Structural Vision RO, part D and part E. This is in line with the BrabantStad Network Analysis. -
Bottlenecks for bicycle paths in the heat
Bottlenecks for bicycle paths in the heat -
Other historic roads
road related to a specific historical event or a very characteristic historical landscape aspect. -
Railway
railway connection between two places; track with rails on which trains run. -
ChurchPath
(foot) path through the agricultural area that leads to the church. -
Tramway
track of a tram line. -
Regional tram Utrecht CS - Utrecht Science Park
The tram route from Utrecht CS to Utrecht Science Park (Uithof). This part of the regional tram was built in 2019 as a replacement for Bus line 12. -
Duration of flooding on and along the road after a shower of 35 mm in 1 hour
Duration of flooding on and along the road after a shower of 35 mm in 1 hour -
Accessibility of roads during flooding
Accessibility of roads during flooding -
Passability of cycle paths after a shower of 70 mm in 1 hour
Passability of cycle paths after a shower of 70 mm in 1 hour